Year | Client | Project | Architect | Contract Sum | Contract Period |
---|---|---|---|---|---|
2017 (In Progress) | CREATIVE INNOVATIONS LTD | PROPOSED CONSTRUCTION OF COMMERCIAL DEVELOPMENT ON PLOT LR NO. 209/11539 | INTRINSIC ARCHITECTS | US$.1,442,308.00(INCLUDING VAT) | 48 WEEKS |
2017 (In Progress) | ACE NAIROBI ONE LIMITED | PROPOSED CONSTRUCTION OF SABIS INTERNATIONAL SCHOOL ON PLOT LR NO. 12825/230 & 207 | BOOGERTMAN & PARTNERS ARCHITECTS | US$.20,556,419.00(INCLUDING VAT) | 52 WEEKS |
2016 (In Progress) | K.B. SEYANI & OTHERS | PROPOSED CONSTRUCTION OF WAREHOUSES | INTRINSIC ARCHITECTS | US$.1,923,077.00(INCLUDING VAT) | 104 WEEKS |
2015 (In Progress) | PAN AFRICA LIFE ASSURANCE LTD | PROPOSED OFFICE DEVELOPMENT ON PLOT LR NO. 1870/V/72 | TRIAD ARCHITECTS | US$.22,220,841.00(VAT INCLUSIVE) | 138 WEEKS |
2014 (In Progress) | GREEN HILLS INVESTMENTS LIMITED | PROPOSED VILLAGE MARKET EXPANSION & GREEN HILLS HOTEL | SYMBION KENYA LIMITED | US$. 43,922,018.00 | 104 WEEKS |
2014 (In Progress) | COHO LIMITED | PROPOSED 9NOS. EXECUTIVE RESIDENTIAL HOUSES PLOT LR NO. 2951/97 | SYMBION KENYA LIMITED | US$. 9,500,000.00 | 78 WEEKS |
2016 | GARDEN CITY RETAIL LIMITED | PROPOSED ROAD RELOCATION WORKS | BOOGERTMAN ARCHITECTS | US$.430,694.55(EXCLUDING VAT) | 8 WEEKS |
2015 | BLACK GOLD VENTURES LTD | PROPOSED OFFICE BLOCK ON PLOT LR. NO. 1870/X/4 | STUDIO INFINITY ATCHITECTS | US$.11,521,739.00(VAT INCLUSIVE) | 117 WEEKS |
2015 | BHARTI AIRTEL INTERNATIONAL | OFFICE FIT-OUT AT THE OVAL 6TH FLOOR | IKON DESIGN LTD | US$.1,624,049.00(VAT INCLUSIVE) | 17 WEEKS |
2015 | PIPE MANUFACTURERS LTD | PROPOSED SHOPPING MALL ON PLOT LR 209/12363/1 | TEAM 2 ARCHITECTS | US$.12,621359.00(VAT INCLUSIVE) | 90 WEEKS |
2014 | INTERNATIONAL SCHOOL OF KENYA | CONSTRUCTION OF ELEMENTARY SCHOOL PLOT LR NO. 2951/123 ALONG KIRAWA ROAD KITISURU | TEAM 2 ARCHITECTS | US$.6,161,974.00 (EXCLUSIVE OF VAT) | 64 WEEKS |
2014 | PORTOFINO PROPERTIES LIMITED | ONE GENERAL MATHENGE APARTMENTS ON PLOT LR NO. 1870/11/2251 & 1870/11/162 ON GENERAL MATHENGE, WESTLANDS | INNOVATIVE-PLANNING AND DESIGN CONSULTANTS | US$. 17,906,977.00 | 104 WEEKS |
2014 | NIC BANK LIMITED | NIC BANK LIMITED VILLAGE MARKET BRANCH | INNOVATIVE-PLANNING AND DESIGN CONSULTANTS | US$. 262,579.00 | 6 WEEKS |
2014 | GREEN SQUARE LTD | PROPOSED SHOPPING MALL LR NO. 631/1033, KERICHO | TEAM 2 ATCHITECTS | US$. 6,781,609.00 | 60 WEEKS |
2014 | INTERNATIONAL SCHOOL OF KENYA | PROPOSED MULT RESIDENTIAL DEVELOPMENT – PHASE II | MENTOR MANAGEMENT | US$. 2,480,434.00 | 52 WEEKS |
2013 | GREEN HILLS INVESTMENTS LTD | NAKUMATT EXTENSIONS AT THE VILLAGE MARKET LIMURU ROAD, NAIROBI | SYMBION KENYA LIMITED | US$. 3,103,448.00 | 20 WEEKS |
2013 | ANJARIWALLA & KHANA | OFFICE FIT-OUT WORKS AT THE OVAL RING ROAD WESTLANDS, NAIROBI | ARTIZANS INTERIOR DESIGNERS | US$. 732,460.00 | 3 MONTHS |
2013 | ART INVESTMENTS LTD | OFFICE BLOCK DEVELOPMENT ON LR. NO. 209/346/39 OFF RIVERSIDE DRIVE, NAIROBI | BOWMAN ASSOCIATES | US$. 5,342,504.00 | 70 WEEKS |
2013 | MAVUNO CHURCH | NATURE AND LOCATION OF MAVUNO CHURCH AT MLOLOGO, ATHI RIVER | EDG & ATELIER ARCHITECTS | US$. 697,674.41 | 26 WEEKS |
2012 | MOMBASA CEMENT LTD | PROPOSED EXTENSION TO EXISTINGFACTORY ON LR NO. 27159 AT ATHI RIVER | HALLMARK TECHNICAL SERVICES PVT LTD | US$. 2,503,868.00 | 39 WEEKS |
2012 | BASE TITANIUM LTD | KWALE MINERAL SANDS PROJECT CP2 – PORT FACILITY, CONSTRUCTION OF CIVIL ONSHORE WORKS | HOWARD HUMPHREYS (EAST AFRICA) LTD | US$. 6,400,000.00 | 81/2 MONTHS |
2012 | ACME APARTMENTS | APARTMENTS DEVELOPMENT AT RIVERSIDE LANE, PLOT LR NO. 205/83 | TEAM 2 ARCHITECTS | US$. 4,814,919.20 | 65 WEEKS |
2012 | INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (THE WORLD BANK) | OFFICE FIT-OUT WORKS AT UPPERHILL, NAIROBI | PHAROS ARCHITECTS | US$.10,710,611.13 (VAT & DUTY FREE) | 45 WEEKS |
2012 | CDC – AMERICAN CONSULATE GENERAL | ADMINISTRATIVE BUILDING & CENTRAL MICROBIOLOGY TB & HIV REFERENCE LABORATORY AT KENYATTA HOSPITAL CAMPUS AND`LABORATORY BUILDING FOR THE KISUMU EAST DISTRICT HOSPITAL IN NYANZA PROVINCE, KISUMU | BEGLIN-WOODS AND SCOPE DESIGNS SYSTEMS ARCHITECTS | US$. 8,617,911.00 (VAT & DUTY FREE) | 12 MONTHS |
2011 | OVAL LIMITED | PROPOSED OFFICE DEVELOPMENT ON PLOT LR NO. 1870/1/251 & 252, RING ROAD, NAIROBI | BOWMAN ASSOCIATES | US$. 13,300,000 | 88 WEEKS |
2011 | FLEETWOOD LIMITED | PROPOSED CONSTRUCTION OF SHOPPING MALL ON PLOT LR NO. 12803/22-23/29-29/30-31/36-37/38-39/44-45 ON THIKA ROAD, NAIROBI | STUDIO INFINITY ARCHITECTS | US$. 20,220,726.00 | 70 WEEKS |
2011 | MITCHELL COTTS FREIGHTS LTD | PROPOSED MITCHELL COTTS LOGISTICS CENTRE PHASE 1 & 2 ON LR NO 19141 MOMBASA ROAD, NAIROBI | TRIAD ARCHITECTS | US$. 3019139 | 35 WEEKS |
2010 | ROTRITE LTD | PROPOSED MUTHANGARI DUPLEXES ON PLOT LR NO. 209/4509, OFF MUTHANGARI DRIVE, NAIROBI | TRIAD ARCHITECTS | US$. 3,651,347.23 | 65 WEEKS |
2010 | SAFEWAYS HYPERMARKETS LTD | PROPOSED COMMERCIAL DEVELOPMENT OM LR. NO. 9122/470 & 471 MTWAPA, COAST PROVINCE | PORTAL CONSULTANCY LTD | US$.3312500 | 65 WEEKS |
2009 | TRANSGLOBAL CARGO CENTRE LTD | PROPOSED NEW CARGO CENTRE PLOT LR NO. 219/9 AT J.K.I.A NAIROBI | BOWMAN ASSOCIATES | US$. 9,653,855.00 | 57 WEEKS |
2009 | NORKAN INVESTMENTS LTD | PROPOSED SHOPPING CENTRE PLOT LR NO. 2248/6 ON LANGATA ROAD, NAIROBI | BOWMAN ASSOCIATES | US$. 10,358,072.00 | 65 WEEKS |
2009 | K.B. SEYANI & OTHERS | PROPOSED WAREHOUSES ON PLOT LR NO. 11155 NORTH AIRPORT ROAD, EMBAKASI | AMKAN CONSULTING ARCHITECTS | US$. 1,570,513.00 | 12 MONTHS |
2009 | PRIMROSE PROPERTIES LTD | NATURE AND LOCATION OF PROJECTPROPOSED CONSTRUCTION OF CAR PARK EXTENSION ON LR NO. 209/410/02, 209/410/04, 209/410/05,209/410/06, NAIROBI | PANKAJ C. PANDYA ARCHITECTS | US$. 1,410,256.00 | 8 MONTHS |
2008 | AGA KHAN HEALTH SERVICE | PROPOSED MAINWORKS AT AGA KHAN HOSPITAL | FNDA ARCHITECTURE INC. | US$. 23,200,000.00 (VAT & DUTY FREE) | 21 MONTHS |
2008 | MINISTRY OF STATE FOR DEFENCE | PROPOSED MAINWORKS FOR CENTRAL REPAIR WORKSHOPS AT KAHAWA GARRISON, NAIROBI | JAWKIM ARCHITECTS | US$. 1,891,760.00 | 36 WEEKS |
2008 | DELTA CORP. EAST AFRICA LTD | PROPOSED OFFICE BLOCK (DELTA CORNER) ON LR. NO. 1870/X/46, 1870/X/48, 1870/X/49, & 206/9 IN WESTLANDS, NAIROBI | ULTIMATE DESIGN LTD | US$. 21,081,080.00 | 130 WEEKS |
2008 | DELTA CORP. EAST AFRICA LTD | PROPOSED OFFICE BLOCK (DELTA CENTER) ON LR NO. 209/11399 IN UPPER HILL, NAIROBI | ULTIMATE DESIGN LTD | US$. 12,188,928.39 | 104 WEEKS |
2008 | ABCON LTD | PROPOSED EXTENSION TO ABCON OFFICE BLOCK ON MASABA ROAD, NAIROBI | KARAGO & ASSOCIATES | US$. 1,577,962.00 | 26 WEEKS |
2007 | NIC BANK LIMITED | PROPOSED INTERIOR FITOUT NAKURU BRANCH | PLANNING INTERIORS LTD | US$.530,000.00 | 15 WEEKS |
2007 | UNITED MILLERS LIMITED | PROPOSED DEVELOPMENT ON PLOT LR NO. KSM BLOCK 2/20 KISUMU | J.S. KALSI & ASSCIATES | US$. 4,626,900.00 | 39 WEEKS |
2007 | COCA COLA EAST & CENTRA AFRICA | PROPOSED HEAD OFFICE | GAPP ARCHITECTS AND URBAN PLANNERS/TRIAD ARCHITECTS | US$.9,701,500.00 | 50 WEEKS |
2007 | UAP PROVINCIAL INSURANCE CO. LIMITED | PROPOSED REFURBISHMENT & IMPROVEMENT ON PLOT LR 209/5535 | TRIAD ARCHITECTS | US$. 1,846,154.00 | 16 WEEKS |
2007 | INTERNATIONAL LIVESTOCK RESEARCH INSTITUTE (ILRI) | PROPOSED BIOSCIENCE EASTERN AND CENTRAL AFRICA (Beca) HUB FACILITY AT THE ILRI CAMPUS, NAIROBI | BEGLIN-WOODS ARCHITECTS | US$. 9,814,294.57 (VAT & DUTY FREE) | 70 WEEKS |
2007 | AGA KHAN HEALTH SERVICE KENYA | PROPOSED EARTHWORK AT AGA KHAN HOSPITAL | FNDA ARCHITECTURE INC. | US$. 775,769.23 (VAT & DUTY FREE) | THREE MONTHS |
2007 | SAFEWAYS HYPERMARKETS LTD | PROPOSED COMMERCIAL DEVELOPMENT ON LANGATA ROAD | PORTAL CONSULTANCY | US$. 7,776,120.00 | 60 WEEKS |
2006 | SAFEWAYS HYPERMARKETS | PROPOSED COMMERCIAL DEVELOPMENT AT ONGATA RONGAI | PORTAL CONSULTANCY | US$. 2,006,838.50 | 12 MONTHS |
2006 | PIPE MANUFACTURERS LTD | PROPOSED COMMERCIAL DEVELOPMENT ON NORTH AIRPORT ROAD EMBAKASI | JKO EAST AFRICA | US$. 972,973.00 | 6 MONTHS |
2006 | CFC LIFE ASSURANCE LTD | PROPOSED REFURBISHMENT AND OFFICE FITOUT ON NYERERE ROAD PHASE I & II | PLANNING INTERIORS LTD | US$. 3,785,113.00 | 34 WEEKS |
2006 | EAST AFRICAN CABLES | PROPOSED NEW PLANT ADDIS ABABA ROAD NAIROBI | KARAGO & ASSOCIATES | US$. 2,479,535.50 | 26 WEEKS |
2006 | INTERNATIONAL HOUSE LIMITED | RESTORATION WORKS INTERNATIONAL HOUSE NAIROBI PHASE I & II | TRIAD ARCHITECTS | US$. 2,070,400.32 | 26 WEEKS |
2006 | APA INSURANCE LIMITED | PROPOSED NEW BUILDING, WESTLANDS | DMJ ARCHITECTS | US$. 6,938,800.00 | 70 WEEKS |
2005 | MITCHEL COTTS VENTURES LTD | PROPOSED REFURBISHMENT AT UNGA HOUSE WESTLANDS, NAIROBI | KARAGO & ASSOCIATES | US$. 333,333.00 | 26 WEEKS |
2005 | GOVERNMENT OF KENYA JAPANES GRANT PROJECT | RESEARCH LABORATORY AT KEMRI, NAIROBI | NIHON SEKKEI INC. JAPAN IN COLLABORATION WITH SUMITOMO MITSUI CONSTRUCTION CO. LTD | US$. 1,700,000.00 BUILDERS WORK (VAT & DUTY FREE) | 45 WEEKS |
2005 | KENYA BREWERIES LIMITED | PROPOSED ALTERATIONS & RENOVATIONS TO NEW VISITORS CENTRE | PLANNING INTERIORS LIMITED | US$. 398,224.00 | 20 WEEKS |
2005 | ADVANCED BIO-EXTRACTS LTD UK | PROPOSED HERBAL EXTRACTION FACILITY AT EPZ ATHI RIVER – PHASE I, II, & III | GMP CONSULTING ENGINEERS | US$.2,800,000.00 (VAT & DUTY FREE) | 30 WEEKS |
2005 | ECON INVESTMENTS LIMITED | PROPOSED EXTENSION TO EXISTING BUILDING NAKUMATT HEADOFFICE IN EMBAKASI, NAIROBI | BOWMAN & ASSOCIATES | US$. 1,180,000.00 | 30 WEEKS |
2005 | K.B. SEYANI & OTHERS | KINGARA COURTS LIMITED, JUNCTION OF KINGARA/GITANGA ROADS NAIROBI | ARCHIPOINTS CONSULTING ARCHITECTS | US$. 1,300,000.00 | 52 WEEKS |
2005 | KOBIL PETROLEUM LIMITED | PROPOSED LPG FILLING PLANT ON LR. NO. 209/5526 AT WUNDANYI ROAD, OFF NANYUKI ROAD, INDUSTRIAL AREA NAIROBI | KURRENT TECHNOLOGIES LTD | US$. 651,123.30 | 5 MONTHS |
2005 | M/S KAKUZI LIMITED | PROPOSED AVACADO PACKING FACTORY | CARRINGTON & ASSOCIATES AGRICULTURAL LTD | US$. 844,196.00 | 6 MONTHS |
2005 | SAFEWAYS HYPERMARKETS | PROPOSED COMMERCIAL DEVELOPMENT AT BURU BURU SHOPPING CENTRE – PHASE II | PORTAL CONSULTANTS | US$.949,935.32 | 20 WEEKS |
2005 | SANDHURST LIMITED | COMMERCIAL DEVELOPMENT AND SERVICE STATION AT KAREN | SHAMLA FERNANDES ARCHITECTS | US$. 2,368,421.00 | 3 MONTHS |
2005 | MAGNOLIA HILLS LIMITED | PROPOSED HOUSING PROJECT ON PEPONI ROAD, NAIROBI | MEHRAZ EHSANI CONSULTING ARCHITECTS | US$. 12,686,600.00 | 18 MONTHS |
2005 | HOMEGROWN KENYA LIMITED | PROPOSED LILY BULB RECYCLING COLDROOM AT TIMAU | ROFE KENNARD AND LAPWORTH (E.A) LTD | US$. 222,918.00 | 14 WEEKS |
2005 | SAFEWAYS HYPERMARKETS | PROPOSED COMMERCIAL DEVELOPMENT AT THIKA TOWN | PORTAL CONSULTANCY | US$. 1,710,526.00 | 8 MONTHS |
2004 | AMERICAN EMBASSY/CDC | PROPOSED REHABILITATION OF EXISTING NPHLS-HIV LAB AT KENYATTA NATIONAL HOSPITAL | BEGLIN-WOODS ARCHITECTS | US$. 125,000.00 | 14 WEEKS |
2004 | ROYAL NETHERLANDS EMBASSY | UPGRADING OF CHANCELLERY SECURITY SYSTEMS AT THE ROYAL NETHERLANDS EMBASSY | E.C. HARRIS/TRIAD ARCHITECTS | US$. 90,000.00 | 8 WEEKS |
2004 | HOMEGROWN KENYA LTD | PROPOSED STAFF WELFARE FACILITIES AT NAIVASHA | ROFE KENNARD AND LAPWORTH (E.A) LTD | US$. 500,000.00 | 16 WEEKS |
2004 | THE HERITAGE A.I.I. INSURANCE CO. LTD | PROPOSED CFC BANK BRANCH ON PLOT LR. NO. 1144/510 NAIVASHA TOWN | TRIAD ARCHITECTS | US$. 728,000.00 | 26 WEEKS |
2004 | KOBIL PETROLEUM LIMITED | PROPOSED REHABILITATION OF KOBIL OJIJO ROAD (ROBRIC) SERVICE STATION | KOBIL PETROLEUM LTD | US$. 359,711.00 | 18 WEEKS |
2004 | NORTHLAKE LIMITED | PROPOSED HOUSING DEVELOPMENT OLE ODUME ROAD, NAIROBI | PINNACLE PROJECTS | US$. 1,282,000.00 | 12 WEEKS |
2004 | SAFEWAYS HYPERMARKETS | PROPOSED COMMERCIAL DEVELOPMENT AT BURU BURU SHOPPING CENTRE | PORTAL CONSULTANTS | US$. 742,611.00 | 26 WEEKS |
2004 | AGA KHAN HEALTH SERVICE KENYA | PROPOSED PREPARATORY WORKS FOR THE PROPOSED PHASE 2A EXPANSION AT THE AGA KHAN HOSPITAL NAIROBI | FNDA ARCHITECTURE INC. (K) | US$. 139,818.00 | 7 WEEKS |
2004 | AMERICAN EMBASSY/CDC | ADDITIONAL WORKS AND LAB UPGRADING FOR CDC/AMERICAN EMBASSY AT KEMRI, NAIROBI | BEGLIN-WOODS ARCHITECTS | US$. 162,665,65 | 9 WEEKS |
2004 | NU-METRO (K) LTD | PROPOSED CINEMAS AT PRESTIGE PLAZA ON NGONG ROAD | VR2 ARCHITECTS (Pty) LTD | US$. 150,000.00 | 6 MONTHS |
2004 | KENYA AIRWAYS | PROPOSED SALES OFFICE AT VILLAGE MARKET, NAIROBI | MEHRAZ EHSANI CONSULTING ARCHITECTS | US$. 150,000.00 | 8 WEEKS |
2004 | AMERICAN EMBASSY/CDC | PROPOSED BLOOD TRANSFUSION CENTRE AT MOI REFERRAL HOSPITAL ELDORET/EXTENSION TO CDC NAIROBI | BEGLIN-WOORS ARCHITECTS | US$.750,000.00 (VAT & DUTY FREE) | 8 MONTHS |
2003 | DEACONS KENYA LTD | PROPOSED SHOP FITOUT FOR WOOLWORTHS KENYA AT CAPITAL CETNRE MOMBASA ROAD, NAIROBI | THE PROJECTS OFFICE | US$ 107,000.00 | 11 WEEKS |
2003 | COCA COLA E.A. LTD | PROPOSED OFFICE FITOUT AT BRITISH AMERICAN BUILDING 1ST FLOOR, NAIROBI | CONSOLSIA LTD | US$. 314,835.00 | 10 WEEKS |
2003 | UNIVERSAL CARRIERS LTD | PROPOSED EXTENSION TO SUPERMARKET | LATE SOLI SHROFF | CONTRACT SUMUS$. 166,667.00 | 14 WEEKS |
2003 | DEACONS KENYA LTD | PROPOSED SHOP FITOUT FOR WOOLWORTHS KENYA LTD AT VILLAGE MARKET | THE PROJECTS OFFICE | US$. 155,972.00 | 9 WEEKS |
2003 | HERON COURT APARTMENT HOTELS LTD | PROPOSED RENOVATIONS AND EXTENSIONS AT HERON COURT HOTEL – PHASE I | SHAMLA FERNANDES ARCHITECTS | US$. 536,930.00 | 24 WEEKS |
2003 | PRIMROSE PROPERTIES LTD | PROPOSED SHOPPING CENTRE NGONG ROAD | PANKAJ C. PANDYA | US$. 6,420,000.00 | 26 WEEKS |
2003 | KENYA PIPELINE CO. LTD IN COLLABORATION WITH ZAKHEM CONSTRUCTION CO. LTD | MORENDAT PUMPING STATION BUILDING & CIVIL WORKS, WESTERN KENYA | PESPEN LTD | US$. 460,694.00 | 20 WEEKS |
2003 | KENYA ASSOCIATION OF MANUFACTURERS | PROPOSED REHABILITATION OF EXISTING PARKING | NGASI CONSULTING ENGINEERS | US$. 42,895.34 | 10 WEEKS |
2002 | CITY SQUARE PROPERTIES LTD | PROPOSED BUILDING FOR UCHUMI SUPERMARKETS IN MERU. | KARAGO & ASSOCIATES | US$. 219,000.00 | 16 WEEKS |
2002 | GOVERNMENT OF KENYA | THE AFRICAN INSTITUTE FOR CAPACITY DEVELOPMENT | PACIFIC CONSULTANTS INTERNATIONAL JAPAN IN COLLABORATION WITH SUMITOMOCONSTRUCTION CO. | US$. 3,462,000.00 BUILDERS WORK (V.A.T. & DUTY FREE) | 65 WEEKS |
2002 | THE PRIESTLY FRATERNITY OF ST. CHARLES BORROMEO | PROPOSED ST JOSEPH’S CHURCH – KAHAWA SUKARI, NAIROBI | SHAMLA FERNANDES ARCHITECTS | US$. 563,000.00 | 48 WEEKS |
2002 | KENTON COLLEGE | NEW MUSIC ROOM FOR KENTON COLLEGE | DMJ ARCHITECTS | US$. 66,800.00 | 12 WEEKS |
2002 | DEACONS KENYA LTD | PROPOSED SHOP FIT-OUT FOR WOOLWORTHS KENYA AT YAYA CENTRE, NAIROBI | THE PROJECTS OFFICE | US$.126,250.00 | 12 WEEKS |
2002 | CDC/AMERICAN EMBASSY | PROPOSED NEW OFFICE BLOCK & LABORATORIES AT K.E.M.R.I,NAIROBI | BEGLIN-WOODS ARCHITECTS | US$. 1,061,100.00 | 35 WEEKS |
2002 | GREENHILLS INVESTMENTS LTD | VILLAGE MARKET PHASE III AT VILLAGE MARKET | MEHRAZ EHSANI CONSULTING ARCHITECTS | US$. 806,600.00 | 36 WEEKS |
2002 | NAME OF CLIENTCOCA-COLA EAST AFRICA LTD | ALTERATION TO EXISTING FACILITY T ACCOMMODATE NEW PLANT AT LIKONI ROAD, NAIROBI | CONSOLSIA ASSOCIATES | US$. 918,000.00 | 10 WEEKS |
2002 | TUSKER MATTRESSES LTD | ALTERATIONS & ADDITIONS TO SUPERMARKET AT PIONEER HOUSE, NAIROBI | DAVID N. GICHOHI | US$. 117,000.00 | 20 WEEKS |
2002 | HOMEGROWN (K) LTD | NEW PACKHOUSE AT JKA, NAIROBI | ROFE KENNARD AND LAPWORTH (EA) LTD | US$. 163,000.00 | 13 WEEKS |
2002 | DE LA RUE CURRENCY AND SECURITY PRINT (K) LTD | EXTENSION TO FACTORY AT RUARAKA | TRIAD ARCHITECTS | US$. 1,387,500.00 (VAT & DUTY FREE) | 21 WEEKS |
2001 | BARCLAYS BANK OF KENYA LTD | PROPOSED RE-ORGANISATION TO ELDORET BRANCH | TRIAD ARCHITECTS | US$. 200,000.00 | 16 WEEKS |
2001 | BARCLAYS BANK OF KENYA LTD | PROPOSED RE-ORGANISATION TO NAKURU WEST BRANCH | MUTISO MENEZES INTERNATIONAL | US$. 100,000.00 | 16 WEEKS |
2001 | NAKUMATT HOLDINGS LIMITED | PROPOSED ADDITIONS & ALTERATIONS TO EXISTING BUILDING ALONG UHURU HIGHWAY, NAIROBI | SOLI SHIROFF ASSOCIATES | US$. 635000 | 18 WEEKS |
2001 | GOVERNMENT OF KENYA | THE IMPROVEMENT OF NEW NYALI AND MTWAPA BRIDGES | ORIENTAL CONSULTANTS CO. LTD | US$. 300,000.00 | 43 WEEKS |
2000 | KENYA HOTEL PROPERTIES LTD | REFURBISHMENT TO HOTEL INTERCONTINENTAL BALL ROOM | LIONEL LEVIN & PARTNERS / DALGLIESH MARSHALL JOHNSON | US$. 897,000.00 | 18 WEEKS |
2000 | SERENA LODGES & HOTELS LTD | RENOVATION OF KISIMA BAR AND LOBBY AT THE NAIROBI SERENA HOTEL | PETER THOMAS ARCHITECTS | US$. 311,000.00 | 24 WEEKS |
2000 | NAKUMATT HOLDINGS LTD | NEW SUPERMARKET STORES AT OLD AIRPORT ROAD, NAIROBI | INFINITY DESIGN | US$. 250,000.00 | 8 WEEKS |
2000 | LION OF KENYA INSURANCE CO. LTD | LION INDUSTRIAL CENTER AT AIRPORT NORTH ROAD, NAIROBI | PLENCE INTERNATIONAL | US$. 687,500.00 | 24 WEEKS |
2000 | ASPEN HILL LTD | ASPEN COURT RESIDENTIAL DEVELOPMENT AT KITISURU, NAIROBI | MEHRAZ EHSANI | US$. 830,000.00 | 60 WEEKS |
1999 | KENYA HOTEL PROPERTIES LTD | REFURBISHMENT TO HOTEL INTERCONTINENTAL LOBBY | SYMBION INTERNATIONAL | US$. 765,625.00 | 26 WEEKS |
1999 | AGA KHAN HOSPITAL , MOMBASA | REFURBISHMENT TO AGA KHAN HOSPITAL, MOMBASA | PANKAJ C. PANDYA ARCHITECTS | US$. 1,100,000.00 | 29 WEEKS |
1999 | ETHANS GOBOWNS LTD | CHAKA PLACE COMMERCIAL DEVELOPMENT AT KILIMANI , NAIROBI | KARAGO & ASSOCIATES | US$. 1,067,000.00 | 40 WEEKS |
1998 | SNC LAVALIN EUROPE B.V | RADIO COMMUNICATION SYSTEM AT RUARAKA | SNC LAVALIN EUROPE B.V | US$ 432,000.00 (V.A.T FREE) | 52 WEEKS |
1998 | VILLAGE MARKET | ADDITIONAL RECREATION FACILITIES AT THE VILLAGE MARKET, NAIROBI | MEHRAZ EHSANI | US$ 1,167,000.00 | 52 WEEKS |
1998 | INTERNATIONAL LIVESTOCK RESEARCH INSTITUTE (I.R.L.I) | ALTERATIONS TO INTERNATIONAL LIVESTOCK RESEARCH INSTITUTE AT KABETE | SYMBION INTERNATIONAL | US$ 80,000.00 | 16 WEEKS |
1998 | LONRHO HOTELS KENYA LIMITED | NEW BEDROOM BLOCK AND RENOVATIONS TO EXISTING PUBLIC AREAS TO NORFOLK HOTEL | BEGLIN – WOODS | US$ 2,920,000 | 46 WEEKS |
1998 | COAST PROVINCIAL GENERAL HOSPITAL | REHABILITATION OF COAST PROVINCIAL GENERAL HOSPITAL – PHASE I, & II | YAMASHITA SEKKEI INC. IN COLLABORATION WITH SUMITOMO CONSTRUCTION. CO. | US$. 1,080,000.00 BUILDERS WORK ( V.A.T & DUTY FREE ) | 58 WEEKS |
1997 | KENYA MEDICAL TRAINING CENTRE | REHABILITATION OF EXISTING TRAINING MEDICAL FACILITIES BUILDING PHASE II | NIHHON SEKKEI INC JAPAN IN COLLABORATION WITH SUMITOMO CONSTRUCTION CO. | US$ 1,000,000.00 BUILDERS WORK (V.A.T. & DUTY FREE” | 36 WEEKS |
1997 | KENYA POWER & LIGHTING CO. LTD | NAKURU SHOW STAND | KARAGO & ASSOCIATES | US$ 835,000.00 | 20 WEEKS |
1997 | C.F.C BANK | BANK HEADQUARTERS AND OFFICES AT MUSUEM HILL NAIROBI | TRIAD ARCHITECTS | US$ 6,129,600.0 | 78 WEEKS |
1997 | METRO CASH AND CARRY | NEW SUPERMARKET STORES ON MOMBASA ROAD | SYMBION INTERNATIONAL | US$ 1,240,000.00 | 23 WEEKS |
1997 | THE CHURCH OF JESUS CHRIST OF LATER DAY SAINTS | NEW MEETING HOUSE AT RIRUTA | TECTURA INTERNATIONAL | US$ 375,000.00 | 45 WEEKS |
1996 | BARCLAYS BANK OF KENYA LTD | NEW BANKING PREMISES AT VOI | MUTISO MENEZES INTERNATIONAL | US$ 360,000.00 | 40 WEEKS |
1996 | KENYA MEDICAL TRAINING CENTRE | CONSTRUCTION OF NEW TRAINING FACILITIES AT KENYATTA HOSPITAL PHASE I | NIHON SEKKEI INC. JAPAN IN COLLABORATION WITH SUMITOMO CONSTRUCTION CO. | US$ 1,135,000.00 BUILDERS WORK (V.A.T. & DUTY FREE) | 40 WEEKS |
1996 | BRITISH AMERICAN TOBACCO (B.A.T LTD) | EXTENSION AND ALTERATION TO EXISTING GODOWN | KABURU OKELLO & PARTNERS | US$ 312,500.00 | 24 WEEKS |
1996 | CAPITAL APARTMENTS | NEW NETAF APARTMENTS AT VALLEY ARCADE NAIROBI | KARAGO & ASSOCIATES | US$ 335,175.00 | 52 WEEKS |
1995 | BARCLAYS BANK OF KENYA LTD | ALTERATIONS AND ADDITIONS TO BARCLAYS BANK MIGORI | TRIAD ARCHITECTS | US$ 146,250.00 | 20 WEEKS |
1995 | EAST AFRICA INDUSTRIES (K) LTD | ADDITIONS AND ALTERATIONS AT NATION DISTRIBUTION CENTRE NANYUKI ROAD | CIVIL PLAN CONSULTING ENGINEERS | US$ 2244,040.00 | 6 WEEKS |
1995 | JACARANDA HOTEL LTD – WESTLANDS NAIROBI | REFURBISHMENT AND EXTENSIONS OF LANDMARK HOTEL | KARAGO & ASSOCIATES | US$ 1,380,000.00 | 30 WEEKS |
1995 | BARCLAYS BANK OF KENYA LTD | ALTERATIONS AND ADDITIONS TO EXISTING BANKING PREMISES AT THIKA | TRIAD ARCHITECTS | US$ 100,000.00 | 12 WEEKS |
1994 | KENYA FORESTRY RESEARSCH INSTITUTE (K.E.F.R.I) | INFORMATION BUILDING, RESEARCH NURSERY BUILDING, SPECIAL CHEMICAL SUSTATION, NEUTRALIZATION TANK GREEN HOUSE SEED STORAGE. AT MUGUGA AND KITUI | YAMASHITA SEKKEI INC. JAPAN IN COLLABORATION WITH SUMITOMO CONSTRUCTION CO. | US$ 3,100,000.0 BUILDERS WORK (V.A.T & DUTY FREE) | 48 WEEKS |
1994 | BARCLAYS TRUST INV, SERVICES LTD | ADDITION OF ONE FLOOR TO EAGLE HOUSE | TRIAD ARCHITECTS | US$ 188,000.00 | 35 WEEKS |
1994 | EAST AFRICAN PORTLAND CEMENT CO. LTD | REHABILITATION AND MODERNISATION OF ATHI RIVER CEMENT PLANT. | OSAKA CEMENT CO. LTD JAPAN IN COLLABORATION WITH SUMITOMO CONSTRUCTION CO. | US$ 5,406,000.00 BUILDERS WORK ( V.A.T & DUTY FREE) | 78 WEEKS |
1993 | JUBILEE INSURANCE CO. LTD | CONVERSION OF PENTHOUSE AND UPGRADING OF FACADES | BUILDING DESIGNER AND CONSULTANTS | US$ 166,385.00 | 20 WEEKS |
1993 | BARCLAYS BANK (K) LTD | NEW BANKING PREMISES AT LIMURU | THARA CONSULTANTS | US$ 386,970.00 | 35 WEEKS |
1993 | VILLAGE MARKET NAIROBI | BOUNDARY WALL, WATER TANK, PUMP HOUSE, WATER SLIDES, SWIMMING POOL, MINI GOLF COURSE | MEHRAZ EHSANI | US$ 560,000.00 | 60 WEEKS |
1993 | INTERNATIONAL CENTRE FOR RESEARCH AND AGROFORESTRY(I.C.R.A.F) | EXTENSIONS TO EXISTING HEADQUARTERS BUILDINGS | TRIAD ARCHITECTS | US$ 188,500.00 | 30 WEEKS |
1993 | BARCLAYS BANK OF KENYA LTD | ALTERATIONS AND EXTENSIONS OF EXISTING BANKING PREMISES AT KISII | SYMBION INTERNATIONAL | US$ 212,750.00 | 30 WEEKS |
1993 | BARCLAYS BANK OF KENYA LTD | ALTERATIONS AND EXTENSIONS OF EXISTING BANKING PREMISES AT KISUMU | MUTISO MENEZES INTERNATIONAL | US$ 100,000.00 | 25 WEEKS |
1991 | JOMO KENYATTA UNIVERSITY COLLEGE OF AGRICULTURE AND TECHNOLOGY (PHASE I, II, & III) | IMPROVEMENT & EXPANSION OF COLLEGE FACILITIES | KUME ARCHITECTS AND ENGINEERS (JAPAN) IN COLLABORATION WITH SUMITOMO CONSTRUCTION CO. | US$ 3,183,550.00 BUILDERS WORK (V.A .T & DUTY FREE) | 38 WEEKS |
1990 | CALTEX OIL LTD | NEW PETRO STATIONS AT KISUMU, KISII, AND NYERI | US$ 120,000.00 | 12 WEEKS | |
1990 | CHURCH COMMOSSIONERS OF KENYA | BISHOPS GARDENS TOWERS – EXECUTIVE OFFICE BLOCK | TRIAD ARCHITECTS | US$ 1,960,000.00 | 78 WEEKS |
1989 | BARCLAYS BANK OF KENYA | NEW BANKING PREMISES AT KARATINA | MUTISO MENEZES INTERNATIONAL | US$ 440,000.00 | 40 WEEKS |
1989 | UNIVERSITY OF NAIROBI | LARGE ANIMALS CLINIC AT KABETE CAMPUS | I.R.C.U (U.O.N) | US$ 92,500.00 | 13 WEEKS |
1988 | D.T DOBIE & CO. LTD | KOLOBOT GARDENS APARTMENTS | TRIAD ARCHITECTS | US$ 1,260,000.00 | 78 WEEKS |
1988 | KENTON COLLEGE NAIROBI | NEW ASSEMBLY HALL AT KENTON COLLEGE | TRIAD ARCHITECTS | US$ 185,000.00 | 26 WEEKS |
1987 | ISIOLO DISTRICT HOSPITAL | NEW HOSPITAL FACILITIES AND RESIDENCE FOR STAFF | TRIAD ARCHITECTS | US$ 3,600,000.00 | 65 WEEKS |
1986 | SEIKH AMIN NAIROBI | NEW MAISSONETTES AT LAVINGTON | S. PANESAR | US$ 120,000.00 | 40 WEEKS |
1986 | DANIDA (DANISH SPONSORED PROJECT) | TAITA TAVETA DISTRICT DEVELOPMENT PROGRAMME, RESIDENCE | MUTISO MENEZES INTERNATIONAL | US$ 310,000.00 | 26 WEEKS |
1985 | NORFOLK HOTEL NAIROBI | EXTENSIONS TO EXISTING KITCHEN AT NORFOLK HOTEL | BEGLIN-WOODS ARCHITECTS | US$ 72,000.00 | 8 WEEKS |
1983 | KENYA COMMERCIAL BANK NAIROBI | NEW BANKING PREMISES AT SARIT CENTRE | RICHARD HUGHES & PARTNERS | US$ 100,000.00 | 16 WEEKS |
1983 | UNION BANK NAIROBI | MAIN OFFICE BLOCK | RICHARD HUGHES | US$ 90,000.00 | 16 WEEKS |
1982 | WANGEMA LIMITED | RESIDENTIAL BUNGALOWS AT KIAMBU | VAMOS INTERNATIONAL | US$ 105,000.00 | 35 WEEKS |
1981 | NAIROBI AIRPORT SERVICE | NEW WORKSHOP AT JOMO KENYATTA AIRPORT | HUGHES & PORKINGTHORNE | US$ 100,000.00 | 16 WEEKS |
1981 | UNIVERSITY OF NAIROBI | JOMO KENYATTA MEMORIAL LIBRARY AT MAIN CAMPUS | MUTISO MENEZES INTERNATIONAL | US$ 3,916,000.00 | 260 WEEKS |
1980 | KENYA POWER AND LIGHTING CO. (K) | NEW STIMA CLUB HOUSE ON THIKA ROAD | AFRICAN PLANNING & DESIGN CONSULTANTS | US$ 576,900.00 | 60 WEEKS |
1979 | UNIVERSITY OF NAIROBI AT KABETE | HALLS OF RESIDENCE ,UNIVERSITY OF NAIROBI KABETE | VAMOS & PARTNERS | US$ 1,083,350.00 | 76 WEEKS |
1979 | STAREHE BOYS CENTRE, NAIROBI | NEW DOMITORY BLOCK | ARCHER ASSOCIATES | US$ 200,000.00 | 26 WEEKS |
1978 | UNGA LIMITED | NEW OFFICE BLOCK INDUSTRIAL AREA, NAIROBI | COWELL MATHEWS PARTNERSHIP | US$ 600,000.00 | 52 WEEKS |